top of page
thumbnail_IMG_1437.jpg

Medway Hospital

Medway Hospital required two

new bed lifts that served all 5 floors.  Astral Ltd were appointed to construct the steel framed structure, and with the help from the Hospital's management team, as well as the experienced and professional design team, the project was a success.  Access was extremely difficult due to the inaccessible court yard in which the lift was positioned, but with careful planning, multiple crane operations and the care demonstrated by Astral's team, this obstacle was overcome.

bottom of page